Lightning Protection Installation

Lightning Protection Installation

Turnkey execution by verified Class-A contractor crews — from borewell driving to exothermic-welded down conductors.

Request Proposal

Design on paper only protects when the execution is right. Earthingmart dispatches verified contractor crews for complete LPS installation: mast erection, air terminal mounting, down-conductor routing with test joints, earth pit construction and final resistance measurement.

Every installation is commissioned with a measured earth-resistance reading, joint-resistance report and photographic pit record — the audit trail your insurance surveyor asks for.

What's included

  • ESE terminal mast erection and alignment
  • Down-conductor installation with test joints
  • Borewell drilling and electrode driving
  • Exothermic welding of all conductor joints
  • Backfill compounding and pit finishing
  • Commissioning report with measured resistance values

How it works

  1. 01
    Crew allocationA verified contractor from the Earthingmart directory is matched to your site and window.
  2. 02
    Material stagingTested electrodes, conductors and hardware dispatched from the nearest hub — Bengaluru, Chennai or Hyderabad.
  3. 03
    Execution & weldingMechanised installation with exothermic-welded joints and in-process photos.
  4. 04
    Testing & handoverEarth resistance measured with a calibrated earth tester; signed commissioning sheet.

Common questions

Can you work on live plants?+

Yes — crews are trained for shutdown-free zones with permit-to-work discipline for refineries and running factories.

Who supplies the material?+

Either way: your own BOQ, or Earthingmart-supplied batch-tested material at store prices.

Start this service

Share your site details — a scoped proposal and fixed price comes back within one working day.

Request Proposal+91 94835 64777 (Mon–Sat)

Other services